Methodology version 1.2, 19 November 2026 (PRD v1.2). A Promise is a specific, checkable commitment made on the public record by an identifiable office-holder or candidate to do, build, deliver, reduce, increase, end, fund or enact something that a reasonable person could later verify.
Eligibility — the four-part inclusion test (§7.2)
- Attributable: a named person made the statement on the record, or a manifesto / collective commitment can be attributed to a clearly identified party or campaign entity.
- Specific: it names an action or outcome rather than only a value, aspiration or general intention.
- Checkable: delivery can be assessed against observable evidence such as a completed project, enacted law, published figure, operational service or measurable result.
- Time-bound or tenure-bound: a stated date / duration exists, or LIE-TIMES applies the clearly labelled end-of-tenure assessment horizon (§9).
Statements that fail the inclusion test remain visible in a separate Statements archive for context. They are not counted as Promises and are excluded from delivery scorecards.
Status taxonomy — the 12 statuses (§8)
Status is an editorial classification, not a user-generated label. Outcome and timeliness are separate fields: a promise can be Kept late, In Progress and overdue, or Partially Kept early or late. Always display both.
- ○ Not Yet Due
- The applicable assessment deadline has not passed and there is not yet verifiable evidence of meaningful action.
- ▶ In Progress
- The applicable deadline has not passed and verifiable action is underway.
- ✓ Kept
- The promised outcome was delivered as described. Timeliness is stored separately (early / on time / late). A/B evidence is required.
- ◐ Partially Kept
- A material portion was delivered, but not the full scope, quantity, geography, quality or outcome. The shortfall must be described.
- ▌▌ Stalled
- Verifiable action began but has stopped for at least six months, or an authoritative source confirms a pause / funding halt.
- ✕ Broken
- The applicable deadline passed and reliable evidence establishes that the outcome was not delivered, or a documented action made it impossible or directly contradicted it.
- ⊗ Abandoned
- Before the applicable deadline, the commitment was formally dropped, disowned, or removed from the official plan without explanation.
- ■ Expired-Tenure Ended
- The responsible tenure ended and the available evidence is insufficient to determine delivery. Never treated as a neutral success.
- ? Not Verified
- Available evidence is not sufficient to determine a reliable current outcome. This is an evidence state, not a negative verdict.
- ! Disputed
- Material evidence or interpretation is contested and editorial review has not resolved it. Both positions and the evidence gap are shown.
- – Not Applicable
- The commitment cannot fairly be assessed against the promiser (for example a candidate who was not elected). Excluded from delivery denominators.
- ↩ Superseded
- Replaced by a later, materially different commitment; the original stays visible with its history.
Deadlines (§9)
A deadline date expires at 23:59 Africa/Lagos (WAT) unless an explicit time is part of the promise. The original deadline is immutable; later moves are recorded as separate DeadlineEvents and the original stays visible. No deadline is ever fabricated: with no applicable date, no countdown is shown.
Evidence (§11)
Grades A (Primary), B (Corroborated), C (Single report), D (Claim only). A final verdict requires Grade A/B evidence and second-editor approval; C alone is never enough for a final verdict, D never enough for any verdict. See Evidence Standards.
Scorecards (§8.2–8.3)
Counts and percentages over decided outcomes only, with the denominator and exclusions stated. No composite honesty score, no ranking, no gauge.